[1]贾康田.桥梁高墩施工线形控制技术[J].武汉工程大学学报,2009,(05):44-17. JIA Kang tian.Control technique of linear form in high bridge piers construction[J].Journal of Wuhan Institute of Technology,2009,(05):44-17.
Longwang temple (Longwangmiao)bridge of Yiwan railway has the 106.5 m maximum pier height. Based on the characteristics of Highpier and bigwind of this bridge, comprehensive linear control techniques for highpier were investigated to form a set of special linear control technique of highpier. Because threedimensional control net was adopted and vertical Laser Plumb Aligner was used together with Total Station, this linear control technique of highpier can completely meet with the precision requirements of specification and is suitable for linear control of high piers construction under various complicated geologic conditions.