[1]杨曼,彭兴文,胡文军.季家坡隧道易燃气体监测分析及其安全对策[J].武汉工程大学学报,2010,(05):66-69.[doi:10.3969/j.issn.16742869.2010.05.018]
 YANG Man,PENG Xing wen,HU Wen jun.Analysis of the monitoring figures and countermeasures of the flammable gases in Jijiapo tunnel[J].Journal of Wuhan Institute of Technology,2010,(05):66-69.[doi:10.3969/j.issn.16742869.2010.05.018]
点击复制

季家坡隧道易燃气体监测分析及其安全对策(/HTML)
分享到:

《武汉工程大学学报》[ISSN:1674-2869/CN:42-1779/TQ]

卷:
期数:
2010年05期
页码:
66-69
栏目:
资源与土木工程
出版日期:
2010-05-31

文章信息/Info

Title:
Analysis of the monitoring figures and countermeasures
of the flammable gases in Jijiapo tunnel
文章编号:
16742869(2010)05006604
作者:
杨曼1彭兴文2胡文军1
1.武汉工程大学环境与城市建设学院,湖北 武汉 430074;
2.中南财经政法大学安全科学与管理学院,湖北 武汉 430074
Author(s):
YANG Man1PENG Xingwen2HU Wenjun1
1.School of Environment and Civil Engineering,Wuhan Institute of Technology, Wuhan 430074,China;
2. School of Safety Science and Administration, Zhongnan University of Economics and Law, Wuhan 430074 China
关键词:
隧道瓦斯监测通风安全
Keywords:
tunnelgasmonitoringventilationsafety
分类号:
TD712
DOI:
10.3969/j.issn.16742869.2010.05.018
文献标志码:
A
摘要:
针对施工过程中逸出易燃气体的季家坡隧道内各预设监测断面测点进行有害气体成分及浓度监测,并凿超前孔进行孔口瓦斯及其他有害气体检测.通过对监测数据进行分析得出,已经开挖隧道沿程空气瓦斯浓度(体积分数,下同)为0.1%~0.2%,属于安全作业区.而在掘进掌子面,尽管隧道正常通风,其上部区域瓦斯浓度仍为4.6%~5%,属于高风险作业区;隧道前方地层是高浓度、低压力的瓦斯赋存.提出了加强通风、施工全过程安全监测、加强施工安全管理的建议.
Abstract:
This paper presents the monitoring result of the ingredients and concentration of the harmful gases at the presetmonitoring points of the sections in the Jijiapo Tunnel where flammable gases run out in construction process. In addition, advance bores are drilled to detect the methane and other hazardous gases. According to analysis of the monitoring data,this paper concludes that the gas concentration is 0.1%-0.2% along the tunnel excavated that belongs to safe work zone, while the gas concentration at 4.6%-5% at the tunneling working face belongs to highrisk work zone of gas emission although normally ventilated,and the layer of rock in front of the tunnel is occurrence of gas with high concentration and low pressure. This paper puts forward some advice for enhancing ventilation,risk monitoring during whole the process of construction and strengthening safety management.

参考文献/References:

[1]施文.有害气体检测仪器原理[M].北京:化学工业出版社,2009:97116.
[2]于立勋.有害气体检测仪器选择与使用[J].中小企业管理,2009,22:287.
[3]铁道部.TB101202002铁路瓦斯隧道技术规范[S].北京:中国铁道出版社,2006.
[4]卫生部政策法规司.GBZ2.12007国家职业卫生标准工作场所有害因素职业接触限值,第1部分:化学有害因素[S].北京:人民卫生出版社,2008.
[5]卫生部政策法规司.GBZ2.22007国家职业卫生标准工作场所有害因素职业接触限值,第2部分:物理因素[S].北京:人民卫生出版社,2008.
[6]刘传正.长江三峡库区地质灭害成因与评价研究[M].北京:地质出版社,2007:189207.

相似文献/References:

[1]王威,代兵权.地质雷达在犇溪口隧道超前地质预报中的应用[J].武汉工程大学学报,2011,(12):46.
 WANG Wei,DAI Bing quan.Application of ground penetrating radar in Benxikoutunnel geological prediction[J].Journal of Wuhan Institute of Technology,2011,(05):46.
[2]杨 凯,肖尊群*,刘胜兵.中小尺寸截面薄壁顶管顶推力的估算[J].武汉工程大学学报,2021,43(01):81.[doi:10.19843/j.cnki.CN42-1779/TQ.201911017]
 YANG Kai,XIAO Zunqun*,LIU Shengbing.Estimation of Jacking Force of Small and Medium Sized Thin-Wall Pipe Jacking[J].Journal of Wuhan Institute of Technology,2021,43(05):81.[doi:10.19843/j.cnki.CN42-1779/TQ.201911017]
[3]叶永富,曾 卫*.新建人行桥桩基对已有地铁隧道位移影响的数值分析[J].武汉工程大学学报,2022,44(06):700.[doi:10.19843/j.cnki.CN42-1779/TQ.202104026]
 YE Yongfu,ZENG Wei*.Numerical Analysis of Effect of Pile Foundation of New Foot Bridge on?Displacement of Existing Subway Tunnel[J].Journal of Wuhan Institute of Technology,2022,44(05):700.[doi:10.19843/j.cnki.CN42-1779/TQ.202104026]

备注/Memo

备注/Memo:
收稿日期:20100327作者简介:杨曼(1982),女,湖北洪湖人,硕士研究生.研究方向:矿井通风与环境保护.指导老师:胡文军,男,教授,博士.研究方向:系统安全分析与监测,矿井通风与安全.
更新日期/Last Update: