[1]张志刚.道路因素、交通环境与交通事故分析[J].公路交通科技,2002,17(6):5659.
[2]Koji Morita,Masashi Ogawa.Geothermal and Solar Heat Used to Melt Snow on Roads[R].United Kingdom,Harwell:CADDET Centre for Renewable Energy,Organization for Economic Cooperation Development(OECD),1998.
[3]胡文举.基于土壤源热泵桥面融雪系统的基础研究[D].哈尔滨:哈尔滨工业大学,2006.
[4]王华军.流体加热道路融雪传热介质特性研究[D].天津大学,2007.
[5]吴少鹏,黄晓明,赵永利.湖北京珠高速公路北段路面结构设计与分析[J].武汉理工大学学报,2002,24(3):7173.
[6]涂瓛,陈辉,吴少鹏,等.导电沥青混凝土融雪化冰热输出功率计算方法[J].武汉理工大学学报,2009,31(13):3740.
[1]管昌生,万兆,胡平放.地源热泵地埋管多层岩土温度场的数值分析[J].武汉工程大学学报,2011,(04):42.[doi:10.3969/j.issn.16742869.2011.04.011]
GUAN Chang sheng,WAN Zhao,HU Ping fang.Numerical analysis on multilayer geotechnical temperature field of GSHP buried tube[J].Journal of Wuhan Institute of Technology,2011,(09):42.[doi:10.3969/j.issn.16742869.2011.04.011]
[2]屠艳平,管昌生,李元松.地源热泵路面融雪化冰可靠性设计及应用分析[J].武汉工程大学学报,2011,(06):61.[doi:10.3969/j.issn.16742869.2011.06.013]
TU Yanping,GUAN Changsheng,LI Yuansong.Reliability design and application analysis on pavement snow melting of ground source heat pump[J].Journal of Wuhan Institute of Technology,2011,(09):61.[doi:10.3969/j.issn.16742869.2011.06.013]
[3]万兆,管昌生,胡平放.岩土温度场对垂直地埋管换热影响的数值分析[J].武汉工程大学学报,2011,(06):65.[doi:10.3969/j.issn.16742869.2011.06.014]
WAN Zhao,GUAN Changsheng,HU Pingfang.Numerical analysis of the influence of geotechnical temperature fieldon heat transfer of GSHP buried tube[J].Journal of Wuhan Institute of Technology,2011,(09):65.[doi:10.3969/j.issn.16742869.2011.06.014]