|本期目录/Table of Contents|

[1]胡德华,刘向东.高层建筑地下室补偿基础设计研究[J].武汉工程大学学报,2010,(11):42-45.[doi:10.3969/j.issn.16742869.2010.11.011]
 HU De hua,LIU Xiang dong.Research on compensated foundation design of tall building basement[J].Journal of Wuhan Institute of Technology,2010,(11):42-45.[doi:10.3969/j.issn.16742869.2010.11.011]
点击复制

高层建筑地下室补偿基础设计研究(/HTML)
分享到:

《武汉工程大学学报》[ISSN:1674-2869/CN:42-1779/TQ]

卷:
期数:
2010年11期
页码:
42-45
栏目:
资源与土木工程
出版日期:
2010-11-30

文章信息/Info

Title:
Research on compensated foundation design
of tall building basement
文章编号:
16742869(2010)11004204
作者:
胡德华1刘向东2
1.武汉工程大学环境与城市建设学院,湖北 武汉 430074;
2.武汉市民用建筑设计研究院,湖北 武汉 430014
Author(s):
HU Dehua1 LIU Xiangdong2
1.School of Environmental and Civil Engineering,Wuhan Institute of Technology,Wuhan 430074, China;
2.Wuhan Research Institute of Civil Building Design,Wuhan 430014, China
关键词:
地下室桩筏基础桩间土补偿作用
Keywords:
basement pileraft foundation soil between piles compensate effect
分类号:
TU473
DOI:
10.3969/j.issn.16742869.2010.11.011
文献标志码:
A
摘要:
高层建筑地下室桩筏基础设计,往往忽略桩筏底板桩间土分担上部荷载的作用,由桩承担全部的上部荷载.实际上在高层建筑巨大的竖向荷载作用下,地下室外墙与桩身将产生压缩变形与沉降,使桩间土的承载力、地下室对地基的卸荷补偿作用逐渐发挥出来.考虑地下室的卸荷补偿作用进行桩基设计时,可大大节省布桩数量;另外由于最小配筋率的限制,无端地增加基础底板厚度时,混凝土的收缩因素对钢材用量的减少并不显著.
Abstract:
Tall building basement piled raft foundation design often overlooked soil between piles to share the role of the upper load. In fact,under the action of tall building huge load,the basement wall and the piles will have a compression deformation and settlement,so that the bearing capacity of soil between piles and compensation for the role of the basement foundation gradually rise.Considering the role of unloading compensation to the basement for pile foundation design will reduce the number of piles,as the minimum reinforcement ratio limits and unwarranted increase in foundation slab thickness,concrete shrinkage factors on the reduction of steel consumption is not remarkable.

参考文献/References:

[1]高立人,方鄂华,钱家茹.高层建筑结构概念设计[M].北京:中国计划出版社,2005:247263.
[2]袁凡凡,栾茂田.筏板—桩—土相互作用的三维弹塑性有限元分析[J].岩石力学与工程学报,2005,24(18):33323336.
[3]杨敏,王树娟.桩筏基础相互作用下土中应力场的变化规律[J].岩土工程学报,1999,21(1):2630.
[4]Yang Min, Wan Shujun. The stress in soil under piled raft foundation[J].Chinese Journal of Geotechnical Engineering,1999,21(1):2630.
[5]史佩东,高大钊.21世纪高层建筑基础工程[M].北京:中国建筑工业出版社,2007:172178.
[6]吕艳梅,刘立新.商品混凝土收缩应力实验研究[J].东南大学学报:自然科学版,2005,35:144148.
[7]齐良峰,张宝印.某高层建筑桩筏基础桩间土反力原位测试研究[J].岩土力学,2004(25):827831.
[8]程泽海,凌道盛.桩筏基础在竖向荷载作用下的时间效应[J].土木工程学报,2004,37(2):7377.

相似文献/References:

备注/Memo

备注/Memo:
龚晓宁收稿日期:20100715作者简介:胡德华(1964),男,湖北黄梅人,高级工程师,一级注册结构工程师.研究方向:建筑结构工程设计研究、安全审查与管理.
更新日期/Last Update: