[1]国家质量监督检验检疫总局.关于2012年全国特种设备安全状况的情况通报[EB/OL].General Administration of Quality Supervision,Inspection and Quarantine of the Peoples Republic of China.Briefings on 2012 China Spcial Equipment Safety Situation[EB/OL].[2]易风华,徐义.电梯事故原因分析与预防措施研究[J].科技创新导报,2011(6):116117.YI Fenghua,XU Yi.Focus on the position of elevator risk assessment from two inspection cases[J].Science and Technology Innovation Herald,2011(6):116117.(in Chinese)[3]全国电梯标准化技术委员会.GB75882003电梯制造与安全规范 [S].北京:中国标准出版社,2003.National Technical Committee 196 on Elevators of Standardization Administration of China.GB 75882003 Safety rules for the construction and installation of electric lifts[S].Peking:Standards Press of China,2003.(in Chinese)[4]全国电梯标准化技术委员会.GB/T209002007/IS0/TS 14798:2006电梯、自动扶梯和自动人行道——风险评价和降低的方法[S].北京:中国标准出版社,2006.National Technical Committee 196 on Elevators of Standardization Administration of China.GB/T 2090020 07/IS0/TS14798:2006 Lifts(elevators),escalators and moving walksRisk assessment and reduction methodology[S].Peking : Standards Press of China,2006.(in Chinese)[5]全国电梯标准化技术委员会.GB248042009提高在用电梯安全性的规范[S].北京:中国标准出版社,2009.National Technical Committee 196 on Elevators of Standardization Administration of China.GB 248042009 Rules for the improvement of safety of existing lifts[S].Peking:Standards Press of China,2009.(in Chinese)[6]曹领军.电梯检验过程中风险评价目的的确定及需要考虑的附加因素分析[J].科技信息,2013(5):487488.CAO Lingjun.Analysis of the purposes of risk assessment and additional factors in elevator inspection[J].Science & Technology Information,2013(5):487488.(in Chinese)[7]刘英杰,武星军,王新华,等.基于专家系统的在用电梯风险评估方法研究[J].机械工程师,2013(5):5356.LIU Yingjie,WU Xingjun,WANG Xinhua,et al.An expert risk assessment system for elevator[J].Mechanical Engineer,2013(5):5356.(in Chinese)[8]顾徐毅,朱昌明,张鹏,等.电梯系统综合安全评价方法的研究[J].中国安全科学学报,2008,18(6):146151.GU Xuyi,ZHU Changming,ZHANG Peng,et al.Research of comprehensive safety assessment method for elevator system[J].China Safety Science Journal,2008,18(6):146151.(in Chinese)[9]张广明,邱春玲,钱夏夷,等.模糊层次分析法和人工神经网络模型在电梯风险评估中的应用[J].控制理论与应用,2009,26(8):931933.ZHANG Guangming,QIU Chunling,QIAN Xiayi,et al.The application of fuzzy analytic hierarchy process and artificial neural network in elevator risk assessment[J].Control Theory & Applications,2009,26(8):931933.(in Chinese)[10]王齐刚,张志豪.从两起检验案例看电梯风险评价的定位[J].科技信息,2010(21):117118.WANG Qigang,ZHANG Zhihao.Focus on the position of elevator risk assessment from two inspection cases[J].Science & Technology Information,2010(21):117118.(in Chinese)
[1]谢新末,胡立嵩*,张彩香,等.官厅水库流域水体中硫丹的分布特征及风险评价[J].武汉工程大学学报,2019,(03):219.[doi:10. 3969/j. issn. 1674-2869. 2019. 03. 003]
XIE Xinmo,HU Lisong*,ZHANG Caixiang,et al.Distribution and Ecological Risk Assessment of Endosulfans in Water Body of Guanting Reservoir Area[J].Journal of Wuhan Institute of Technology,2019,(06):219.[doi:10. 3969/j. issn. 1674-2869. 2019. 03. 003]
[2]王子超,雷克江*,杨 霜,等.基于模糊层次分析法的瓦斯隧道施工安全风险评估[J].武汉工程大学学报,2019,(06):573.[doi:10. 3969/j. issn. 1674-2869. 2019. 06. 011]
WANG Zichao,LEI Kejiang*,YANG Shuang,et al.Safety Risk Assessment of Gas Tunnel Construction Based on Fuzzy Analytic Hierarchy Process[J].Journal of Wuhan Institute of Technology,2019,(06):573.[doi:10. 3969/j. issn. 1674-2869. 2019. 06. 011]