[1] 黄山. 广州地铁九号线高增站深基坑数值分析与研究[D]. 广州:广州大学,2011. [2] 吴晓旺,付建军,杜学飞. 某隧道基坑监测及安全稳定分析[J]. 城市地质,2009,15(3):26-28. WU X W,FU J J,DU X F. Monitoring and stability analysis on a tunnel foundation pil[J]. Urban Geology,2009,15(3):26-28. [3] 曾繁慧,邹存静. 巷道围岩变形破坏数值模拟[J]. 辽宁工程技术大学学报(自然科学版),2013,32(12):1664-1668.ZENG F H,ZOU C J.Numerical simulation of roadway surrounding rock deformation and destruction[J]. Journal of Liaoning Technical University(Natural Science),2013,32(12):1664-1668. [4] 俞建霖,龚晓南. 基坑工程变形性状研究[J]. 土木工程学报,2002,35(4):89-90. YU J L,GONG X N.Traits of excavation deformation[J]. Journal of Civil Engineering,2002,35(4):86-90. [5] 刘利民,张建新. 深基坑开挖监测时测斜管不同埋设位置量测结果比较[J]. 勘察科学技术,1995,78(6):37-39. LIU L M,ZHANG J X. Comparison of measuring result for different setting position of the inclinometer tube for the monitoring of deep foundtion pit excavation[J]. Exploration Science and Technology,1995,78(6):37-39. [6] 胡钧,杨熙章,杜坚. 上海人民大舞台商厦深基坑监测与分析[J]. 上海同济学报,1997,129(5):604-608. HU J,YANG X Z,DU J. Deep foundation pit monitoring of shanghai renmindawutai business mansion[J]. Journal?of?Tongji?University,1997,129(5):604-608. [7] 李爱民. 关于深基坑水平位移监测方案的探讨[J]. 测绘学院学报,2000,17(1):19-21. LI A M. Research on horizontal displacement monitoring project of the deep foundation [J]. Journal of Institute of Surveying and Mapping,2000,17(1):19-21. [8] LONG M. Database for retaining wall and ground movements due to deep excavations[J]. Journal of Geotechnical and Geoenvironmental Engineering ASCE,2001,127(33):203-224. [9] 陈军. 深基坑支护工程的设计、施工与监测[J]. 湖南大学学报,2002,29(3):117-121. CHEN J. Design, construction and monitoring of deep foundation pit support engineering[J]. Journal of Hunan University,2002,29(3):117-121. [10] 任建喜,冯晓光,刘慧,等. 地铁车站深基坑围护结构变形规律监测研究[J]. 铁道工程学报,2009,137(3):89-92. REN J X,FENG X G,LIU H, et al. Research on the deformation law of supporting structure for deep foundation pit of metro station[J]. Journal of Railway Engineering Society,2009,137(3):89-92. [11] 刘杰,姚海林,任健喜. 地铁车站基坑围护结构变形监测与数值模拟[J]. 岩土力学,2010,31(增刊2):456-461. LIU J,YAO H L,REN J X. Monitoring and numerical simulation of deformation of retaining structure in subway station foundation pit[J]. Rock and Soil Mechanics,2010,31(Suppl. 2):456-461. [12] ADDENBROOK T I. Displacement flexibility number for mutilpropped retaining wall design[J]. Journal of Geotechnical and Geoenviromental Engineering,2000,126(1):718-726. [13] 张明聚,何欢,李春辉,等. 明挖地铁车站围护结构受力变形监测与数值模拟分析[J]. 北京工业大学学报,2013,209(6):875-880. ZHANG M J,HE H,LI C H,et al. Deformation and force analysis on retaining structure of an open- excavated subway station by monitoring and numerical simulation[J]. Journal of Beijing University of Technology,2013,209(6):875-880. [14] 郭楠. 兰州地铁车站某深基坑桩撑支护结构施工监测与数值模拟分析[D]. 兰州:兰州理工大学,2014. [15] 朱彦鹏,杨校辉,周勇,等. 兰州地铁车站深基坑支护选型分析与数值模拟研究[J]. 水利与建筑工程学报,2016,14(1):55-59. ZHU Y P,YANG X H,ZHOU Y,et al. Deep foundation pit retaining structure selection in Lanzhou metro station and its numerical simulation[J]. Journal of Water Resources and Architectural Engineering,2016,14(1):55-59.