[1] 潘永仁,丁美. 大型沉管隧道管段沉放施工技术[J]. 现代隧道技术,2004,41(5):1-5. PAN Y R,DING M . Techniques for sinking and jointing tube sections of large immersed tube tunnel[J]. Modern Tunneling Technology,2004,41 (5): 1-5. [2] 胡政才,先其明,马积薪. 日本多摩川沉管隧道的设计与施工[J]. 世界隧道,1995 (5):52-75.HU Z C,XIAN Q M,MA J X. Design and construction of tamagawa immersed tunnel in Japan [J]. World Tunneling,1995 (5):52-75. [3] 宁茂权,肖明清. 海底沉管隧道关键技术设计与分析[J]. 铁道工程学报,2008,119(8):50-57. NING M Q,SHAO M Q. Design and analysis of key technology about channel immersed tunnel [J]. Journal of Railway Engineering Society,2008,119(8):50-57. [4] 王朝辉. 内河沉管隧道浮运沉放施工技术[J]. 施工技术,2012,41(18):117-120. WANG C H.Construction technology of floating and sinking of immersed tunnel crossing inland river [J]. Construction Technology,2012,41(18):117-120. [5] 聂美琳译. 京叶台场隧道[J]. 世界沉管隧道技术,1998(5):41-85.NIE M L (Translated). Keiyo odaiba tunnel [J]. World Immersed Tunnel Technology,1998 (5):41-85. [6] RASMUSSEN N S. Concrete immersed tunnels-forty years of experience [J]. Tunneling and Underground Space Technology,1997,12(1):33-46. [7] GURSOY A. Immersed steel tube tunnels: an American experience [J]. Tunneling and Underground Space Technology,1995,10 (4):439-453. [8] 王解先,许琛,陆彩萍. 沉管沉放的实时监测[J]. 测绘学报,2002,31(增刊):70-72. WANG J X,XU C,LU C P. Real-time surveying of immersed tube allocation [J]. Journal of Geodesy and Geo-Information,2002,31(Suppl. ):70-72. [9] 潘永仁. 上海外环沉管隧道大型管段浮运方法[J]. 施工技术,2004,33(5):52-54. PAN Y R.The floating transport method of large elements employed for Shanghai out-ring immersed tube tunnel [J]. Construction Technology,2004,33(5):52-54. [10] 吴瑞大,方长远. 适合近岸管节水下施工的测量塔全站仪定位方法[J]. 中国港湾建设,2012(4):43-46. WU R D,FANG C Y. Positioning methods by total stations for survey towers suitable for near-shore underwater laying of tunnel sections[J]. China Harbor Engineering,2012(4):43-46. [11] 邓建林. 沈家门港海底沉管隧道浮运、沉放施工控制技术[J]. 隧道建设,2015,35 (9):914-919. DENG J L. Control technology for towing and sinking of immersed tubes: case study on Shenjiamen port sub-sea tunnel [J]. Tunnel Construction,2015,35 (9):914-919. [12] 郭建文. 海河隧道沉管沉放对接的主要施工技术[J]. 铁道标准设计,2013(4): 73-77. GUO J W. Key construction technologies of sinking and docking of immersed tube of Haihe river tunnel [J]. Railway Standard Design,2013(4):73-77. [13] 申琪玉,邱峰,张海燕. 广州洲头咀隧道管段浮运沉放关键技术研究[J]. 施工技术,2010,39(5): 15-17. SHEN Q Y,QIU F,ZHANG H Y.Research on key sinking technology of pipe sections in Guangzhou Zhoutouzui immersed tunnel[J]. Construction Technology,2010,39(5):15-17. [14] 任朝军,苏林王,吕黄,等. 声纳法在管节沉放实时定位测量中的应用[J]. 现代隧道技术,2012,49(5):132-135. REN C J,SU L W,L? H,et al. Application of the sonar method to real-time positioning measurement for an immersed element [J]. Modern Tunneling Technology,2012,49(5):132-135. [15] 郭禄光,樊功瑜. 最小二乘法与测量平差[M]. 上海:同济大学出版社,1984. [16] 田青文,刘万林. 控制测量学[M].西安:西安地图出版社,2004.