[1] 卢海林. 预应力混凝土曲线箱梁剪力滞效应 理论分析与试验分析[D]. 天津: 天津大学, 2005.
Lu Hailin. Theoretical analysis and experimental study on shear-lag effect of prestress concrete curved box beam[D]. Tianjin: Tianjin University, 2005. (in Chinese)
[2] 万海滨. 曲线预应力混凝土箱梁剪力滞效应研究[D]. 西安: 长安大学, 2008.
Wan Haibin. Study on shear lag effect of curved prestressed concrete box girder[D]. Xian: Changan University, 2008. (in Chinese)
[3] 蔡汶珊. 薄壁曲线箱梁剪力滞数值计算与实验研究[D]. 长沙: 长沙理工大学, 2010.
Cai Wenshan. Numerical calculate and experimental research about shear lag effect of curved thin wall box girders[D]. Changsha: Changsha University of Science & Technology, 2008. (in Chinese)
[4] 刘建新, 马麟, 胡庆安. 薄壁箱梁振动时的剪力滞效应[J]. 郑州大学学报, 2008, 29(3): 122-128.
Liu Jian-xin, Ma Lin, Hu Qin-gan. The research of analysis method of shear lag’s effect on forced vibration of thin-wall box-girder[J]. Zhengzhou: Journal of Zhengzhou University, 2008, 29(3): 122-128. (in Chinese)
[5] 张永健, 黄平明, 狄谨, 等. 波形钢腹板组合箱梁自振特性与试验研究[J]. 交通运输工程学报, 2008, 8(5): 76-80.
Zhang Yong-jian, Huang Ping-ming, Di Jin, et al. Free vibration characteristics and experiment study of composite box girder with corrugated steel webs[J]. Journal of Zhengzhou University, 2008, 8(5): 76-80. (in Chinese)
[6] 甘亚南, 周广春. 基于能量变分原理的薄壁箱梁自振特性分析[J]. 中国公路学报, 2007, 20(1): 73-78.
Gan Ya-nan, Zhou Guang-chun. Analysis of free vibration characteristics of thin-walled box girder based on energy variation principle[J]. China Journal of Highway and Transport, 2009, 8(1): 94-98.)(in Chinese)
[7] Taysi N, Ozakc M. Free vibration analysis and shape optimization of box-girder bridges in straight and curved planform[J]. Engineering Structures, 2002(24): 625-637.
[8] Hugo C Gomeza, Paul J Fanning, Maria Q Fenga, et al. Testing and long-term monitoring of a curved concrete box girder bridge[J]. Engineering Structures, 2011(33): 2861-2869.
[9] 项海帆, 姚玲森. 高等桥梁结构理论[M]. 北京: 人民交通出版社, 2001.
Xiang Hai-fan, Yao Ling-sen. The theory of higher bridge structure[M]. Beijing: China Communications Press, 2001. (in Chinese)
[10] 王新敏. ANSYS工程结构数值分析[M]. 北京: 人民交通出版社, 2007.
[1]卢海林,朱松波,周小龙,等.不同荷载作用下直线箱梁剪力滞效应分析[J].武汉工程大学学报,2014,(12):39.[doi:10. 3969/j. issn. 1674-2869. 2014. 012. 008]
,ZHOU Xiao-long,et al.Shear lag effect of straight box girder under different loads[J].Journal of Wuhan Institute of Technology,2014,(03):39.[doi:10. 3969/j. issn. 1674-2869. 2014. 012. 008]
[2]卢海林,张 山,万崇勇,等.静动荷载作用下简支预应力混凝土曲线箱梁剪力滞效应分析[J].武汉工程大学学报,2016,38(05):465.[doi:10. 3969/j. issn. 1674?2869. 2016. 05. 011]
LU Hailin,ZHANG Shan,WAN Chongyong,et al.Shear Lag Effect of Curved Box Girder of Simply-Supported Prestressed Concrete Under Static and Dynamic Load[J].Journal of Wuhan Institute of Technology,2016,38(03):465.[doi:10. 3969/j. issn. 1674?2869. 2016. 05. 011]
[3]卢海林,张伟,颜昌雄.移动荷载速度对悬臂曲线箱梁剪力滞效应的影响[J].武汉工程大学学报,2014,(03):18.[doi:103969/jissn16742869201403004]
LU Hai lin,ZHANG Wei,YAN Chang xiong.Moving load speed on shear lag effect of cantilever curved box girder[J].Journal of Wuhan Institute of Technology,2014,(03):18.[doi:103969/jissn16742869201403004]