[1] 周猛飞,王树青,金晓明. 先进控制技术在延迟焦化装置的应用[J]. 化工自动化及仪表,2009,36(1):79-82.
ZHOU Meng-fei, WANG Shu-qing, JIN Xiao-ming. Application of advanced process control in delayed coking units[J].Control and Instruments in Chemical Industry, 2009,36(1):79-82.(in Chinese)
[2] 李出和,李卓. 延迟焦化装置安全联锁的探讨[J]. 石油化工设计,2010,27(3):1-4.
LI Chuhe, LI Zhuo. Safety interlock of delayed coker[J]. Petrochemical Design, 2010,27(3):1-4. (in Chinese)
[3] 姜飞.延迟焦化装置全流程建模与仿真培训系统的研究[D]. 青岛:中国石油大学(华东),2007.
JIANG Fei. Modeling of delayed coking unit and simulation training system[D].Qingdao:China University of Petroleum(Hudong), 2007. (in Chinese)
[4] 申海平,刘自宾,范启明. 延迟焦化技术进展[J]. 石油学报:石油加工,2010,26(增刊):14-18.
SHEN Hai-ping, LIU Zi-bin, FAN Qi-ming. Development of delayed coking technology[J].Acta Petrolei Sinica:Petroleum Processing Section, 2010(Supp1):14-18. (in Chinese)
[5] 汪学峰.九江石化顺序控制系统投用[J].石油化工自动化,2012,48(2):13-14.
[6] 陈涛,黄佳丽.RS-485接口在单片机系统中的扩展与组网应用[J].山东煤炭科技,2001(5):30-31.
[1]李建强.炼厂提高延迟焦化装置处理能力方法[J].武汉工程大学学报,2012,(8):31.[doi:103969/jissn16742869201208008]
LI Jian qiang.Ways of improving delayed coking unit’s processing capacity for oil refinerys[J].Journal of Wuhan Institute of Technology,2012,(03):31.[doi:103969/jissn16742869201208008]
[2]王利恒,易斯乐,吴崧.焦炭塔操作仿真培训系统设计[J].武汉工程大学学报,2014,(06):32.[doi:103969/jissn16742869201406008]
WANG Li heng,YI Si le,WU Song.Design of simulation training system for coke drum operation[J].Journal of Wuhan Institute of Technology,2014,(03):32.[doi:103969/jissn16742869201406008]