|本期目录/Table of Contents|

[1]陈金华,叶琴,汪喆伦.水运工程造价控制与管理[J].武汉工程大学学报,2014,(03):63-66.[doi:103969/jissn16742869201403013]
 CHEN Jin hua,YE Qin,WANG Zhe lun.Construction cost control and management for waterway engineering[J].Journal of Wuhan Institute of Technology,2014,(03):63-66.[doi:103969/jissn16742869201403013]
点击复制

水运工程造价控制与管理(/HTML)
分享到:

《武汉工程大学学报》[ISSN:1674-2869/CN:42-1779/TQ]

卷:
期数:
2014年03期
页码:
63-66
栏目:
其他
出版日期:
2014-03-31

文章信息/Info

Title:
Construction cost control and management for waterway engineering
文章编号:
16742869(2014)03006304
作者:
陈金华1 叶琴1汪喆伦2
1.武汉交通职业学院交通工程学院,湖北 武汉 430065;2.武汉体育学院运动训练学院,湖北 武汉 430079
Author(s):
CHEN Jinhua1YE Qin1WANG Zhelun2
1.School of Communications,Wuhan Technical College of Communications,Wuhan 430065,China;2.Sports Training School, Wuhan Institute of Physical Education,Wuhan 430079,China
关键词:
水运工程工程造价工程量清单
Keywords:
waterway engineering construction cost bill of quantities
分类号:
U69
DOI:
103969/jissn16742869201403013
文献标志码:
A
摘要:
针对水运工程在决策、设计、招投标、施工4个阶段工程造价管理存在的问题,从工程投资控制环节、投资监管等方面,提出工程造价动态管理的措施,以期提高政府投资效率.在决策阶段,根据项目特点和沿岸水文地质条件,选择合适的工程地址;在设计阶段,进行设计招标,运用价值工程的方法对设计方案进行比选及实行限额设计;在招投标阶段,提高业主方项目经理专业素质,评标过程以单价评审为主,进行单价分析,分析综合单价的合理性,并引入市场竞争机制;在施工阶段,确定合理的工程量计量方式,暂定金额按实际发生计量,加强对工程变更的管理.水运工程项目建设采用上述管理方法和控制手段,可以有效控制工程造价,节约工程资金,使投资获得最大经济效益和社会效益.
Abstract:
Dynamic project cost management measures in the investment control,supervision and other links were proposed to solve the problems of waterway project cost management at the stages of decisionmaking,design and bidding and construction and to improve the efficiency of government investment.At decisionmaking stage,the appropriate project address should be selected according to the characteristics and the hydrogeological conditions of the project.At design stage,value engineering methods should be used to select the design programs and designlimited should be taken.At bidding stage,professional quality of the owners project manager should be improved,unit price review can be given priority in the evaluation process and market competition mechanism can be introduced.At construction stage,the reasonable way of engineering measurement should be determined,the provisional amount could be measured by the actual and the engineering change management must be strengthened.Pproject funding is reduced with the above management methods and means,achieving the effective control objective of project cost and getting the maximum economic and social benefits in waterway project.

参考文献/References:

[1]邢燕.基于工程量清单计价模式下的工程造价控制[J].施工技术 2010,39 (s):461464.XING Yan.Project cost control based on the bill of quantities valuation[J].Construction Technology,2010,39 (s):461464.(in Chinese)[2]交通部水运定额站.JTS271-2008 水运工程工程量清单计价规范[S]. 北京:人民教育出版社,2008.The ministry of transportation water quota station.JTS271-2008 Code of valuation with bill quantity of port and waterway engineering[S].Beijing: China Communications Press 2008. (in Chinese)[3]杨国义.浅谈市政工程的造价控制与管理[J]. 建筑施工,2010,32(11):11831184.YANG GuoYi.Brief discussion on construction cost control and management for public works[J].Building Construction,2010,32(11):11831184.(in Chinese)[4]刘丹.建设工程造价控制的分析探讨[J].铁道工程学报,2010(10):109114.LIU Dan.Analysis and discussion on control of construction project cost[J].Journal of Rallway Engineering Society,2010(10):109114.(in Chinese)[5]中华人民共和国住房和城乡建设部.GB50500-2013建设工程工程量清单计价规范[S].北京: 中国计划出版社,2013.The Peoples Republic of China Ministry of housing and urban rural development.GB50500-2013 Code of bills of quantities and valuation for construction works[S].Beijing: China Planning Press,2013.(in Chinese)

相似文献/References:

[1]陈金华,叶琴.水运工程造价控制与管理[J].武汉工程大学学报,2014,(03):60.
 CHEN Jin-hua,YE Qin.Construction cost control and management for marine traffic engineering[J].Journal of Wuhan Institute of Technology,2014,(03):60.

备注/Memo

备注/Memo:
收稿日期:20131117基金项目:湖北省教育厅科学技术研究项目(B2013227)作者简介:陈金华(1975),男,湖北武汉人,讲师,硕士.研究方向:工程管理.
更新日期/Last Update: 2014-04-18