[1]周猛飞,王树青,金晓明.先进控制技术在延迟焦化装置的应用[J].化工自动化及仪表,2009,36(1):7982.ZHOU Mengfei,WANG Shuqing,JIN Xiaoming.Application of advanced process control in delayed coking units[J].Control and Instruments in Chemical Industry,2009,36(1):7982.(in Chinese)[2]李出和,李卓.延迟焦化装置安全联锁的探讨[J].石油化工设计,2010,27(3):14.LI Chuhe,LI Zhuo.Safety interlock of delayed coker[J].Petrochemical Design,2010,27(3):14.(in Chinese)[3]姜飞.延迟焦化装置全流程建模与仿真培训系统的研究[D].青岛:中国石油大学(华东),2007.JIANG Fei.Modeling of delayed coking unit and simulation training system[D].Qingdao:China University of Petroleum(Huadong),2007.(in Chinese)[4]申海平,刘自宾,范启明.延迟焦化技术进展[J].石油学报:石油加工,2010,26(增刊):1418.SHEN Haiping,LIU Zibin,FAN Qiming.Development of delayed coking technology[J].Acta Petrolei Sinica:Petroleum Processing Section,2010(Supp1):1418.(in Chinese)[5]汪学峰.九江石化顺序控制系统投用[J].石油化工自动化,2012,48(2):1314.[6]陈涛,黄佳丽.RS485接口在单片机系统中的扩展与组网应用[J].山东煤炭科技,2001(5):3031.
[1]王利恒,易斯乐,吴 崧.焦炭塔操作仿真培训系统设计[J].武汉工程大学学报,2014,(03):76.
WANG Li-heng,YI Si-le,WU Song.Design of simulation training system for coke drum operation[J].Journal of Wuhan Institute of Technology,2014,(06):76.